Bulky waste from construction and demolition Share
Large items not specified in other categories and need no specific handling before the materials can be processed properly.
- Blinds
- Bumper
- Carpet
- Fish tub
- Foam board
- Hot tub
- Linoleum flooring
- Plastic car parts
- Plastic pipes
What happens to the material?
The material is shredded at the receiving and sorting plant at Gufunes, making it possible to retrieve metals by mechanical sorting. The rest is baled and landfilled at Álfsnes.
Reusable items can be given for reuse in the container of SORPA second hand market, Godi hirdirinn.
Large items not specified in other categories and need no specific handling before the materials can be processed properly.
- Blinds
- Bumper
- Carpet
- Fish tub
- Foam board
- Linoleum flooring
- Plastic car parts
- Plastic pipes
What happens to the material?
The material is shredded at the receiving and sorting plant at Gufunes, making it possible to retrieve metals by mechanical sorting. The rest is baled and landfilled at Álfsnes.
Reusable items can be given for reuse in the container of SORPA second hand market, Godi hirdirinn.
Bulky waste from construction and demolition
code 1401617Payment required | 55,82 kr./kg |
Not accepted
Not accepted
Clothing and reusable items
Paper and cardboard
Metals and other recyclables
Various organic waste
Glass and minerals
Mixed ordinary wastes and bulky waste
-
- Mixed municipal waste and similar waste
- Household waste and similar wastes
- Household waste for pre-sorting
- Compressible waste from construction and demolition
Special waste
Electrical equipment and hazardous waste
- Asbestos
- Light bulbs
- Medicines
-
- Electrical and electronic equipment
- Refrigerators
- Small electrical equipment
- Display screens
- Large electric equipment
- Computers, printers and telephones
- Vehicle batteries
- Batteries
- Hazardous waste